Towcester Town Council

Serving the people of Towcester

Towcester Town Hall

Town Clerk: Miss Elizabeth Cox
The Town Hall, 86 Watling
Street, Towcester
Northamptonshire NN12 6BS

Tel: 01327 350995

Latest News

Merry Christmas and a Happy New Year

Merry Christmas and a Happy New Year

The Town Council offices are now closed until 3rd January 2019.

Emails will be monitored periodically and urgent enquiries answered as soon as possible.

We wish all a Merry Christmas and a Happy and Peaceful New Year.

Posted: Fri, 21 Dec 2018 14:47 by Liz

Tags: News

The proposed reorganisation of local government in Northamptonshire

Summary

This consultation seeks views on the proposal that government has received from Northamptonshire councils for local government reorganisation.

This consultation closes at 11:45pm on 25 January 2019

Consultation description

The Local Government and Public Involvement in Health Act 2007 requires that before a proposal for local government reorganisation can be implemented, the Secretary of State... Read More »

Posted: Wed, 19 Dec 2018 11:09 by Liz

Tags: News

Towcester Town Crier - December 2018

Towcester Town Crier - December 2018

Towcester Town Crier - Issue 177 / December 2018

Posted: Wed, 05 Dec 2018 10:36 by Liz

Tags: Events, News, Publications

A5 Roadworks Update 23rd November 2018

A5 Roadworks Update 23rd November 2018

Please see the attached document for the latest update about Highways England's essential maintenance works to the A5 in Towcester.

Posted: Fri, 23 Nov 2018 17:00 by Liz

Tags: News

A5 Roadworks Update 9th November 2018

A5 Roadworks Update 9th November 2018

Latest update from Highways England:

"We are currently carrying out works to the section of the A5 between The Lindens and Reffield Close which lies within Phase 3 of our essential maintenance scheme in Towcester.

These works include the installation of new road gullies and surface water connections to the existing two metres deep drainage system, cleaning the existing drainage system with a jetting... Read More »

Posted: Fri, 09 Nov 2018 16:02 by Liz

Tags: News

A5 Roadworks Update 29th October 2018

Latest update from Highways England:

"Essential Maintenance: A5 High Street Towcester – Update 29.10.2018

We are currently working in Phase 3 of our essential maintenance scheme to the A5 in Towcester. Construction of a new reinforced concrete slab over the existing gas main between Richmond Road and Silverstone Brook Bridge has been completed and a length of collapsed surface water drain near... Read More »

Posted: Tue, 30 Oct 2018 09:52 by Liz

Tags: News

A5 Roadworks Update 19th October 2018

A5 Roadworks Update 19th October 2018

Update from Highways England for 19th October 2018

"Essential Maintenance: A5 High Street Towcester – Update 19.10.2018

I'm pleased to confirm that yesterday [18th October] we completed works to resurface the carriageway in Phases 2b (part) and 2c. Today we are laying High Friction Surfacing (HFS) to areas of the newly resurfaced carriageway, applying road markings to replace those removed during... Read More »

Posted: Mon, 29 Oct 2018 13:09 by Liz

Tags: News

Halloween & Bonfire Night Safety

Halloween & Bonfire Night Safety

Please see attached a special Halloween and Bonfire Night edition of the Safety Matters newsletter produced by Northamptonshire Police and Northamptonshire Fire and Rescue Service. It contains some important safety messages on topics ranging from fireworks to considerations around trick or treating.

Posted: Tue, 16 Oct 2018 12:58 by Liz

Tags: News

A5 Roadworks Update 15th October 2018

Update from Highways England:

"Good afternoon

I have to advise you that the wet weather yesterday and today has prevented us from laying asphalt, HFS and road markings to Phases 2b (part) and 2c as programmed.

This work will now be carried out between Thursday 18th October and Saturday 20th October 2018 and preparations made for the road to be re-opened by 7am Sunday morning.

Access will then be available... Read More »

Posted: Mon, 15 Oct 2018 17:00 by Liz

Tags: News

A5 Roadworks Update 12th October 2018

Update from Highways England:

"Good Morning.

I can confirm that works to take out and replace the previously poured reinforced concrete slab over the gas main in Phases 2b (part) and 2c, which unfortunately did not reach the required strength to enable it to be trafficked, have been completed and the concrete has reached the required strength.

On Sunday 14th October 2018, tack coat will be applied to... Read More »

Posted: Fri, 12 Oct 2018 17:00 by Liz

Tags: News

Subscribe to RSS Feed Help for RSS Feeds